TruXedoPlus®: Installation
Components come pre-assembled and ready for quick installation. There is no metal-to-metal contact, no drilling required, no damage to your truck.


FOR MORE DETAILED INSTALLATION INSTRUCTIONS, PLEASE REFER TO OWNER’S MANUAL. (PDF Format)
 
Installation of TruXedoPlus.
 
Step 1.
Clamp side rails onto inside lip of truck bed.
Step 2.
Attach push- lock and tonneau cover to toolbox.
Step 3.
Align toolbox with slots in side rails and attach toolbox/cover onto side rails. Adjust push-lock tension on toolbox.
Step 4.
Unroll cover toward tailgate, rotate header into header stops and press down to lock toggle into header. Pull cover over rails to adhere Velcro® brand fastening system along rails.

Additional Instructions
     
Ford General Motors/Chevy Nissan

2001-2003 Ford F150 Super Crew

2004-2007 Ford Flareside

Chevrolet Full Size Stepside
Chevy Colorado-GMC Canyon w/Side Rails
Nissan Titan Utili-Track
     
Other Special Instructions    
TruXedo Bulkhead Seal Kit    

Truxedo Tonneau. Truxedo Tonneau. Truxedo Tonneau. Truxedo Tonneau. Truxedo Tonneau. Truxedo Tonneau. Truxedo Tonneau. Truxedo Tonneau.