Original TruXedo®: Installation
Components come pre-assembled and ready for quick installation. There is no metal-to-metal contact, no drilling required, no damage to your truck.
FOR MORE DETAILED INSTALLATION INSTRUCTIONS, PLEASE REFER TO OWNER’S MANUAL. (PDF Format) |
||
![]() |
||
| Step 1. Clamp side rails onto inside lip of truck bed. |
Step 2. Install header guides into front header, set cover assembly on rails behind cab, slide header guides onto side rails and tighten. |
Step 3. Unroll cover toward tailgate, rotate header into header stops and press down to lock toggle into header. Pull cover over rails to adhere Velcro® brand fastening system along rails. |
| Additional Instructions | ||
| Ford | General Motors/Chevy | Nissan |
| Toyota | Other Special Instructions | |
| • Toyota Tundra Stepside • Toyota Tacoma Side Rail |
• TruXedo Bulkhead Seal Kit | |


