Lo Pro QT®: Installation
| Components come pre-assembled and ready for quick installation. There is no metal-to-metal contact, no drilling required*, no damage to your truck. |
Watch how easy it is to install |
FOR MORE DETAILED INSTALLATION INSTRUCTIONS, PLEASE REFER TO OWNER’S MANUAL. (PDF Format) |
|
![]() |
Step 1. |
Step 2. Set cover assembly behind cab and attach spring-loaded header guides to the side rails. |
Step 3. Unroll cover toward tailgate, rotate header into header stops and press down to latch the cover. Pull cover over rails to adhere Velcro® brand fastening system along rails. |
| Additional Instructions | ||
| Dodge | Ford | General Motors/Chevy |
| • Dodge RamBox • 2008 Dodge Dakota w/ Track System |
• Ford F-150 w/ Factory Cargo Rails • 2001 - 2003 Ford F150 Super Crew |
• 2007 Clamp for Cargo Management • Chevrolet Composite Box |
| Honda | Hummer | Nissan |
| • Honda Ridgeline |
• 2005 - 2012 Nissan Frontier • 2005 - 2007 Nissan Frontier Bed Extender |
|
| Toyota | Other Special Instructions | |


